The Route 1 Bridge over I-95 in Stamford will be closed between Courtland Avenue & Seaside Avenue beginning Friday evening.
The road closure begins on Friday, August 16 at 6 p.m. and runs through Sunday, August 18 at 6 p.m. During that time, the bridge will be closed so that contractors can pour the bridge approach slabs. Traffic will be detoured from Route 1 to Courtland Avenue and Hamilton Avenue.
While the closure is in effect, the Exit 9 Southbound off ramp and the Route 1 Northbound I-95 on-ramp will be closed.
The following ramps will remain open:
-
Exit 9 Northbound on- and off-ramps at Seaside Ave
-
Exit 9 Southbound on-ramp
ALL TRAVEL LANES ON I-95 WILL BE OPEN and unaffected by the construction.